AirTrunk TOK1 (Inzai)
ExpandingE1Media / secondary sourceAirTrunk TOK1(印西)
| Location | Chiba Inzai(Municipality centroid) |
|---|---|
| Status | Expanding(as of 2025-02-10) |
| Operators | AirTrunk(Operator) |
| Power capacity | 40 MW(Planned maximum (incl. future)) Original (Japanese): 40MW規模の新棟着工(報道) |
| Nearby power infrastructure | Total generating capacity within 30 km: ~3,929.8 MW (5 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2025-02-10 · ExpansionExpansion: Expanding
Original (Japanese): 印西のTOK1で40MW規模の新棟着工
→ ExpandingSources: 日本経済新聞
地図を読み込み中…
This pin is the municipality representative point, not the exact facility location
Sources (1)
- 「データセンター銀座」千葉・印西市、新設続く日本経済新聞 · Media · Published 2025-12-09 · Retrieved 2026-07-15Supports: Existence, Status, Power capacity