Shows
Transmission lines and substations of 154 kV and above registered in OpenStreetMap, and their approximate positional relationship to published data centers.
Does not show
Contractable power, current available capacity, whether connection is possible, construction costs, supply start dates, or redundant supply routes.
How to confirm
Check the demand-side WELCOME ZONE MAP (TEPCO Power Grid) and Welcome Zone Map (Kansai Transmission and Distribution), and ultimately carry out prior consultation and a connection study with the relevant transmission and distribution operator.