Colt Inzai Data Centre 4
OperationalE3Official company or government statementColt印西データセンター4
| Location | Chiba Inzai(Municipality centroid) |
|---|---|
| Status | Operational(as of 2025-02-26) |
| Power capacity | 20 MW(IT load) |
| Nearby power infrastructure | Total generating capacity within 30 km: ~3,929.8 MW (5 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2025-02-26 · OperationOperation: Unknown → Operational
Original (Japanese): Colt印西データセンター4 開設
Original (Japanese): 20MW/8,747㎡。三井物産・フィデリティ・インベストメンツとのJV第2弾。公式データシートは「第一フェーズ建設中・運用開始前に完売」とも記載しており詳細な稼働範囲は要継続確認。
→ OperationalSources: クラウド Watch, Colt DCS
地図を読み込み中…
This pin is the municipality representative point, not the exact facility location
Sources (2)
- Coltデータセンターサービス、「Colt印西データセンター4」を開設クラウド Watch · Media · Published 2025-02-26 · Retrieved 2026-07-15Supports: Schedule
- Colt 印西データセンター4Colt DCS · Official statement · Retrieved 2026-07-15Supports: Existence, Power capacity, Location
This page does not determine illegality or impropriety. If you find an error, request a correction.