Equinix OS4x Data Center
OperationalE3Official company or government statementエクイニクス OS4x データセンター
| Location | Osaka Minoh 彩都粟生北4丁目1-58(Block-level) |
|---|---|
| Status | Operational(as of 2024-06-05) |
| Power capacity | 14.4 MW(IT load) Original (Japanese): 国内4拠点目のxScaleデータセンター。OS2xと免震構造を連結。ダイレクトチップ・リアドア熱交換機等の液冷対応でAI需要に対応 |
| Nearby power infrastructure | Total generating capacity within 30 km: ~2,214.5 MW (7 plants) Nearest large plant: 南港火力発電所 (火力) 600 MW / ~28.8 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2024-06-05 · OperationOperation: Unknown → Operational
Original (Japanese): OS4xデータセンター開設
Original (Japanese): 国内4拠点目のxScale。生成AI需要拡大に対応した液冷対応。
→ OperationalSources: エクイニクス, Data Center Café
地図を読み込み中…
Approximate location
Sources (2)
- エクイニクス、国内4拠点目のハイパースケーラー向けデータセンター「OS4x」を大阪に開設エクイニクス · Official statement · Published 2024-06-05 · Retrieved 2026-07-15Supports: Power capacity, Schedule
- エクイニクス、ハイパースケーラー向けxScaleデータセンター「OS2x」を大阪に開設Data Center Café · Media · Retrieved 2026-07-15Supports: Existence