Equinix TY12x Data Center
OperationalE3Official company or government statementエクイニクス TY12x データセンター
| Location | Chiba Inzai 泉野2丁目(Municipality centroid) |
|---|---|
| Status | Operational(as of 2021-03) |
| Power capacity | 54 MW(IT load) Original (Japanese): 最終フェーズでIT電力供給54MW・約6,500ラック。2021年3月開設時は960ラックから開始 |
| Nearby power infrastructure | Total generating capacity within 30 km: ~3,929.8 MW (5 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2021-03 · OperationOperation: Unknown → Operational
Original (Japanese): TY12x データセンター開設
Original (Japanese): 960ラックから開始し最終的に約6,500ラック・54MWへ拡張予定のxScaleデータセンター。
→ Operational
地図を読み込み中…
This pin is the municipality representative point, not the exact facility location
Sources (2)
- TY12x データセンターエクイニクス · Official statement · Retrieved 2026-07-15Supports: Existence, Power capacity
- EQUINIX TY12x 実績紹介大林組 · Official statement · Retrieved 2026-07-15Supports: Location
This page does not determine illegality or impropriety. If you find an error, request a correction.