Equinix TY12x Data Center

OperationalE3Official company or government statement

エクイニクス TY12x データセンター

LocationChiba Inzai 泉野2丁目(Municipality centroid)
StatusOperational(as of 2021-03)
Power capacity54 MW(IT load)
Original (Japanese): 最終フェーズでIT電力供給54MW・約6,500ラック。2021年3月開設時は960ラックから開始
Nearby power infrastructure
Total generating capacity within 30 km: ~3,929.8 MW (5 plants)
Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2021-03 · Operation
    Operation: Unknown → Operational

    Original (Japanese): TY12x データセンター開設

    Original (Japanese): 960ラックから開始し最終的に約6,500ラック・54MWへ拡張予定のxScaleデータセンター。

    Operational
地図を読み込み中…

This pin is the municipality representative point, not the exact facility location

Sources (2)

This page does not determine illegality or impropriety. If you find an error, request a correction.