Equinix TY13x Data Center
OperationalE3Official company or government statementエクイニクス TY13x データセンター
| Location | Chiba Inzai 泉野2丁目101-8(Municipality centroid) |
|---|---|
| Status | Operational(as of 2023-06-29) |
| Power capacity | 36 MW(Planned maximum (incl. future)) Original (Japanese): 第一期8MW、フル稼働時36MWのIT電力供給を計画。TY12xの隣接地 |
| Nearby power infrastructure | Total generating capacity within 30 km: ~3,929.8 MW (5 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2023-06-29 · OperationOperation: Unknown → Operational
Original (Japanese): TY13x データセンター開設
Original (Japanese): 東京で2ヵ所目のxScaleデータセンター。TY12x隣接地。第一期8MW、フル稼働時36MW計画。
→ OperationalSources: クラウド Watch, エクイニクス
地図を読み込み中…
This pin is the municipality representative point, not the exact facility location
Sources (2)
- エクイニクス、東京で第2カ所目のハイパースケーラー向けデータセンター「TY13x」を開設クラウド Watch · Media · Published 2023-06-30 · Retrieved 2026-07-15Supports: Location
- エクイニクス、東京で第二番目のハイパースケーラー向けデータセンター「TY13x」を開設エクイニクス · Official statement · Published 2023-06-29 · Retrieved 2026-07-15Supports: Existence, Power capacity