Matsue Nakao District Industrial Park (Data Center Attraction)

AnnouncedE3Official company or government statement

松江市 中尾地区企業団地(Green×Digital Town Project・データセンター誘致)

LocationShimane Matsue(Municipality centroid)
StatusAnnounced(as of 2026-02)
Nearby power infrastructure
Total generating capacity within 30 km: ~265.3 MW (3 plants)
Nearest large plant: 玉島火力発電所 (火力) 500 MW / ~120.8 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2026-02 · Announcement
    Announcement: Unknown → Announced

    Original (Japanese): 中尾地区企業団地の整備・データセンター誘致方針を発表

    Original (Japanese): 島根原子力発電所の電力活用を掲げ、Green×Digital Town Project(GDTP)推進協議会が中尾地区(約11ha)に企業団地を整備。2027年度分譲開始・2031年度稼働目標。データセンター運営事業者は未定(市が整備主体)。

    Announced
    Sources: 松江市
  • 2026-02 · Announcement
    Announcement: Unknown → Announced

    Original (Japanese): 中尾地区企業団地の整備・データセンター誘致方針を発表

    Original (Japanese): 島根原子力発電所の電力活用を掲げ、Green×Digital Town Project(GDTP)推進協議会が中尾地区(約11ha)に企業団地を整備。2027年度分譲開始・2031年度稼働目標。データセンター運営事業者は未定(市が整備主体)。

    Announced
    Sources: 松江市
地図を読み込み中…

This pin is the municipality representative point, not the exact facility location

Sources (1)

This page does not determine illegality or impropriety. If you find an error, request a correction.