MC Digital Realty KIX11 Data Center

OperationalE3Official company or government statement

MCデジタル・リアルティ KIX11データセンター

LocationOsaka Minoh 彩都粟生北6丁目1(Block-level)
StatusOperational(as of 2019-06)
Power capacity25 MW(IT load)
Original (Japanese): KIXキャンパス2棟目。2019年6月竣工・稼働開始
Nearby power infrastructure
Total generating capacity within 30 km: ~2,214.5 MW (7 plants)
Nearest large plant: 南港火力発電所 (火力) 600 MW / ~29 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2019-06 · Operation
    Operation: Unknown → Operational

    Original (Japanese): KIX11データセンター竣工・サービス開始

    Original (Japanese): 25.0MW/23,155㎡・Tier III相当。大阪キャンパス2棟目。

    Operational