MC Digital Realty NRT10 Data Center
OperationalE3Official company or government statementMCデジタル・リアルティ NRT10データセンター
| Location | Chiba Inzai 大塚2丁目9-3(Block-level) |
|---|---|
| Status | Operational(as of 2021-09) |
| Power capacity | 39 MW(IT load) Original (Japanese): 約4,800ラック収容。NRTキャンパス最初の棟(他にNRT12・NRT14があり3棟合計約100MW) |
| Nearby power infrastructure | Total generating capacity within 30 km: ~7,945.8 MW (13 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~27.3 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2021-09 · OperationOperation: Unknown → Operational
Original (Japanese): NRT10データセンター開業
Original (Japanese): 39MW/37,850㎡・約4,800ラック。NRTキャンパス最初の棟として首都圏で開業。
→ OperationalSources: MCデジタル・リアルティ
地図を読み込み中…
Approximate location
Sources (2)
- NRTキャンパスMCデジタル・リアルティ · Official statement · Retrieved 2026-07-15Supports: Existence, Power capacity
- MCデジタル・リアルティ、印西で“AI対応”の「NRT12」データセンター開業ASCII.jp · Media · Retrieved 2026-07-15Supports: Schedule
This page does not determine illegality or impropriety. If you find an error, request a correction.