NTT DATA Osaka (Ibaraki) Data Center
AnnouncedE3Official company or government statementNTTデータ 大阪(茨木)データセンター
| Location | Osaka Ibaraki(Municipality centroid) |
|---|---|
| Status | Announced(as of 2026-07-16) |
| Operators | NTTデータグループ(Developer) |
| Power capacity | 36 MW(IT load) Original (Japanese): 総IT電力容量36MW(事業者発表)。第1期は2027年度後半竣工予定 |
| Nearby power infrastructure | Total generating capacity within 30 km: ~4,475 MW (15 plants) Nearest large plant: 南港火力発電所 (火力) 600 MW / ~26.7 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2026-07-16 · CorrectionCorrection: Under construction → Announced
Original (Japanese): 状態を訂正: 出典は建設計画の発表であり着工確認ではない
Original (Japanese): 元の出典(NTTデータグループ公式発表2025-05-27)は建設計画の発表であり、第1期竣工は2027年度後半予定と将来のこと。着工を確認できる一次情報ではないため、under_constructionからannouncedへ訂正する。
→ AnnouncedSources: NTTデータグループ - 2025-05-27 · AnnouncementAnnouncement: Announced
Original (Japanese): 大阪府茨木市での新データセンター建設を発表(着工未確認)
Original (Japanese): 総IT電力容量36MW。第1期は2027年度後半竣工予定と発表されているが、着工を確認する一次情報は未取得のためstatusはannouncedに留める。
→ AnnouncedSources: NTTデータグループ - 2025-05-27 · AnnouncementAnnouncement: Under construction
Original (Japanese): 大阪府茨木市での新データセンター建設を発表
Original (Japanese): 総IT電力容量36MW。第1期は2027年度後半竣工予定。
→ Under constructionSources: NTTデータグループ
This pin is the municipality representative point, not the exact facility location
Sources (1)
- 大阪府での新たなデータセンターの建設についてNTTデータグループ · Official statement · Published 2025-05-27 · Retrieved 2026-07-15Supports: Existence, Operator, Location, Power capacity, Schedule
This page does not determine illegality or impropriety. If you find an error, request a correction.