APL Itoshima Data Center

AnnouncedE1Media / secondary source

APL 糸島データセンター

LocationFukuoka Itoshima(Municipality centroid)
StatusAnnounced(as of 2024-02-05)
OperatorsAPLグループ(アジア・パシフィック・ランド)(Developer)
Power capacity300 MW(Utility supply capacity)
Original (Japanese): 総受電容量30万kW(=300MW)規模、投資額3000億円超(報道・事業者)。2029年から段階運用予定
Nearby power infrastructure
Total generating capacity within 30 km: ~875.6 MW (3 plants)
Nearest large plant: 唐津火力発電所 (火力) 500 MW / ~24.1 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2026-07-16 · Correction
    Correction: Under construction → Announced

    Original (Japanese): 状態を訂正: 出典は「25年着工予定」の報道であり着工確認ではない

    Original (Japanese): 元の出典(日本経済新聞2024-12-05)は2025年春着工予定という将来の計画を報じたものであり、着工を確認できる一次情報ではないため、under_constructionからannouncedへ訂正する。

    Announced
  • 2024-12-05 · Announcement
    Announcement: Announced

    Original (Japanese): 糸島市に3000億円超のデータセンター建設を発表(2025年春着工予定・着工未確認)

    Original (Japanese): 2025年春着工予定、2029年から段階的に運用開始予定と報道。着工を確認する一次情報は未取得のためstatusはannouncedに留める。

    Announced
  • 2024-12-05 · Announcement
    Announcement: Under construction

    Original (Japanese): 糸島市に3000億円超のデータセンター建設を発表

    Original (Japanese): 2025年春着工、2029年から段階的に運用開始予定。

    Under construction
  • 2024-02-05 · Announcement
    Announcement: Announced

    Original (Japanese): 投資額3000億円超・2025年春着工の計画詳細が判明

    Original (Japanese): 西九州自動車道前原IC付近、約12万2000㎡の開発区域に6棟のデータセンター。2029年1月に1〜2棟目稼働、2034年12月に6棟目稼働まで順次建設。

    Announced
地図を読み込み中…

This pin is the municipality representative point, not the exact facility location

Sources (1)

This page does not determine illegality or impropriety. If you find an error, request a correction.