APL Kitakyushu Data Center
AnnouncedE1Media / secondary sourceAPL 北九州データセンター
| Location | Fukuoka Kitakyushu(Municipality centroid) |
|---|---|
| Status | Announced(as of 2023-08) |
| Operators | APLグループ(アジア・パシフィック・ランド)(Developer) |
| Power capacity | 120 MW(Planned maximum (incl. future)) Original (Japanese): 総受電容量120MW(2棟)。投資額1250億円。北九州学術研究都市の事業用地62,822㎡(売却価格20億1659万円)。2026年着工・2027年9月受電開始目標 |
| Nearby power infrastructure | Total generating capacity within 30 km: ~5,028 MW (13 plants) Nearest large plant: 新小倉火力発電所 (火力) 600 MW / ~3.1 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2025 · AnnouncementAnnouncement: Announced
Original (Japanese): 北九州市でのデータセンターキャンパス開発計画
→ AnnouncedSources: Data Center Café - 2023-08 · AnnouncementAnnouncement: Announced
Original (Japanese): 120MW・投資額1250億円の計画詳細が判明
Original (Japanese): 北九州学術研究都市の事業用地62,822㎡を取得。2027年秋までに着工予定と報道。
→ Announced
地図を読み込み中…
This pin is the municipality representative point, not the exact facility location
Sources (3)
- 北九州に大規模データセンター、米社が1250億円投資日本経済新聞 · Media · Published 2023-08-23 · Retrieved 2026-07-15Supports: Power capacity
- APLとゴールドマンサックスが日本に2つのデータセンターキャンパスを開発Data Center Café · Media · Retrieved 2026-07-15Supports: Existence, Operator, Location
- 北九州市のデータセンター誘致の取組について北九州市 · Government document · Retrieved 2026-07-15Supports: Site area
This page does not determine illegality or impropriety. If you find an error, request a correction.