Iriki Industrial Park AI Data Center (Digital Dynamic)

AnnouncedE3Official company or government statement

入来工業団地AIデータセンター(デジタルダイナミック)

LocationKagoshima Satsumasendai 入来町副田(入来工業団地)(Municipality centroid)
StatusAnnounced(as of 2025-11-25)
Power capacity19 MW(Planned maximum (incl. future))
Original (Japanese): 段階的に規模を拡大し最大で受電容量19MWを見込む
Nearby power infrastructure
Total generating capacity within 30 km: ~1,457 MW (6 plants)
Nearest large plant: 川内火力発電所 (火力) 500 MW / ~22.6 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.
Site area37,000

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2025-11-25 · Announcement
    Announcement: Unknown → Announced

    Original (Japanese): デジタルダイナミック、入来工業団地の事業予定者に選定

    Original (Japanese): 薩摩川内市入来工業団地の分譲交渉者にデジタルダイナミック(東京)が選定。AIデータセンターを整備し2026年11月操業開始、段階的に最大19MWまで拡大予定。

    Announced
地図を読み込み中…

This pin is the municipality representative point, not the exact facility location

Sources (3)

This page does not determine illegality or impropriety. If you find an error, request a correction.