Google Inzai Data Center
OperationalE3Official company or government statementGoogle 印西データセンター
| Location | Chiba Inzai(Municipality centroid) |
|---|---|
| Status | Operational(as of 2023-04) |
| Operators | Google(Operator) |
| Nearby power infrastructure | Total generating capacity within 30 km: ~3,929.8 MW (5 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2023-04 · OperationOperation: Operational
Original (Japanese): 日本初のデータセンターとして開設
Original (Japanese): Googleが日本で初めてのデータセンターを千葉県印西市に開設。
→ OperationalSources: Google Japan Blog
地図を読み込み中…
This pin is the municipality representative point, not the exact facility location
Sources (2)
- 米グーグルが千葉県印西市に日本初のデータセンターを開設ジェトロ · Media · Published 2023-04-17 · Retrieved 2026-07-15Supports: Existence
- 千葉県印西市にデータセンターを開設Google Japan Blog · Official statement · Published 2023-04-13 · Retrieved 2026-07-15Supports: Existence, Operator, Location, Status
This page does not determine illegality or impropriety. If you find an error, request a correction.