JERA Chiba Thermal Power Station AI Data Center Project
AnnouncedE3Official company or government statementJERA千葉火力発電所 AIデータセンター計画
JERA Chiba Thermal Power Station AI Data Center Project is a data center facility or project in Chiba, Chiba; associated companies: JERA Co., Inc., RHAELM Holdings Ltd.; status: Announced; 400 MW (Planned maximum (incl. future)). Sources: 株式会社JERA
Last verified: 2026-10-08 · Record updated: 2026-10-08 10:59:50
Source-backed Markdown| Location | Chiba Chiba(Location unverified) |
|---|---|
| Status | Announced(as of 2026-10-01) |
| Operators | JERA Co., Inc.(Developer)RHAELM Holdings Ltd.(Developer) |
| Power capacity | 400 MW(Planned maximum (incl. future)) Original (Japanese): 最大40万kW(400MW)のAIデータセンターインフラ計画。IT負荷・受電容量の内訳は公表値から区分できず、確定した初期容量ではありません。2028年頃の運用開始を目指す。 |
| Power colocation / procurement | Power colocation planned Original (Japanese): 既存の千葉火力発電設備からオンサイト型電力供給を受ける計画。 |
| Water resources & flood exposure | Open the water utility and flood layers |
| AI workload (claimed) | Original (Japanese): JERA・Dell Technologies・RHAELMがAIインフラ構想の覚書を締結。DellはAI基盤技術の提供者であり、施設運営者とは記録しません。 |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2026-10-01 · AnnouncementAnnouncement: Announced
Original (Japanese): JERA、Dell TechnologiesおよびRHAELMによる日本における国家規模のAIインフラ開発の加速に向けた覚書の締結について
Original (Japanese): 千葉火力発電所で最大400MW規模のAIインフラ開発を計画。2028年頃の運用開始を目指す。建設開始・稼働の確認ではない。
→ AnnouncedSources: 株式会社JERA
Sources (1)
- JERA、Dell TechnologiesおよびRHAELMによる日本における国家規模のAIインフラ開発の加速に向けた覚書の締結について株式会社JERA · Official statement · Published 2026-10-01 · Retrieved 2026-10-08Supports: Existence, Location, Operator, Status, Power capacity, AI workload, Schedule, Power procurement / colocation
This page does not determine illegality or impropriety. If you find an error, request a correction.
Last verified: 2026-10-08