Keppel Tokyo Data Centre 3
OperationalE3Official company or government statement| Location | Chiba Inzai 大塚2丁目8(Block-level) |
|---|---|
| Status | Operational(as of 2025) |
| Nearby power infrastructure | Total generating capacity within 30 km: ~7,945.8 MW (13 plants) Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~27.1 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2025 · OperationOperation: Unknown → Operational
Original (Japanese): Tokyo Data Centre 3 竣工・ハイパースケーラーへ賃貸中
Original (Japanese): Keppel DC REITが2025年9月に822億円で取得。15年契約でグローバルハイパースケーラーにフル賃貸。
→ OperationalSources: Keppel Data Centres, Keppel Ltd.
地図を読み込み中…
Approximate location
Sources (2)
- Tokyo Data Centre 3Keppel Data Centres · Official statement · Retrieved 2026-07-15Supports: Existence
- Keppel DC REIT acquires hyperscale data centre in Inzai City, Greater TokyoKeppel Ltd. · Official statement · Retrieved 2026-07-15Supports: Operator
This page does not determine illegality or impropriety. If you find an error, request a correction.