Keppel Tokyo Data Centre 3

OperationalE3Official company or government statement
LocationChiba Inzai 大塚2丁目8(Block-level)
StatusOperational(as of 2025)
Nearby power infrastructure
Total generating capacity within 30 km: ~7,945.8 MW (13 plants)
Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~27.1 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2025 · Operation
    Operation: Unknown → Operational

    Original (Japanese): Tokyo Data Centre 3 竣工・ハイパースケーラーへ賃貸中

    Original (Japanese): Keppel DC REITが2025年9月に822億円で取得。15年契約でグローバルハイパースケーラーにフル賃貸。

    Operational
地図を読み込み中…

Approximate location

Sources (2)