SoftBank Sakai AI Data Center
AnnouncedE3Official company or government statementソフトバンク 堺AIデータセンター(シャープ堺工場跡)
| Location | Osaka Sakai(Municipality centroid) |
|---|---|
| Status | Announced(as of 2026-07-16) |
| Operators | ソフトバンク(Operator) |
| Power capacity | 150 MW(Utility supply capacity) Original (Japanese): 受電容量約150MW(事業者発表)。2026年稼働目標 |
| Nearby power infrastructure | Total generating capacity within 30 km: ~5,720 MW (16 plants) Nearest large plant: 南港火力発電所 (火力) 600 MW / ~8.7 km Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant. |
Timeline
Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.
- 2026-07-16 · CorrectionCorrection: Under construction → Announced
Original (Japanese): 状態を訂正: 出典は土地・建物取得契約の締結であり着工確認ではない
Original (Japanese): 元の出典(ソフトバンク公式発表2025-03-14)は「土地や建物の取得に関する契約を締結」という内容で、着工を確認できる一次情報ではないため、under_constructionからannouncedへ訂正する。
→ AnnouncedSources: ソフトバンク - 2025-03-14 · AnnouncementAnnouncement: Announced
Original (Japanese): シャープ堺工場の土地・建物の取得契約を締結(着工未確認)
Original (Japanese): 受電容量約150MWのAIデータセンター構築へ。2026年稼働開始が目標だが、着工を確認する一次情報は未取得のためstatusはannouncedに留める。
→ AnnouncedSources: ソフトバンク - 2025-03-14 · AnnouncementAnnouncement: Under construction
Original (Japanese): シャープ堺工場の土地・建物の取得契約を締結
Original (Japanese): 受電容量約150MWのAIデータセンター構築へ。2026年の稼働開始を目標。
→ Under constructionSources: ソフトバンク
This pin is the municipality representative point, not the exact facility location
Sources (1)
- AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結ソフトバンク · Official statement · Published 2025-03-14 · Retrieved 2026-07-15Supports: Existence, Operator, Location, Power capacity
This page does not determine illegality or impropriety. If you find an error, request a correction.