Data centers in Minoh: status, MW and sources
3 published facilities and projects in Minoh, with location, status, capacity types, dates and sources. Focused on AI and hyperscale infrastructure; not a census of all data centers.
Registry updated (distinct from content verification): 2026-07-15 18:14:24
Reading the Minoh records
The registry contains 3 published records in Minoh. Announced projects, construction and operational facilities are distinguished, with dates and sources for each record.
MW values distinguish IT load, utility supply, facility, campus and planned maximum capacity. Records can cover buildings in the same campus, so their capacities are not simply summed. Municipality coordinates are not exact facility locations.
Recorded facilities and projects
MC Digital Realty KIX11 Data Center
Minoh, Osaka · Operational · E3
25 MW(IT load)
Status as of: 2019-06
Content verified: not recorded
Companies: MCデジタル・リアルティ
Sources: クラウド Watch鴻池組
Equinix OS2x Data Center
Minoh, Osaka · Operational · E3
10 MW(IT load)
Status as of: 2021-12-24
Content verified: not recorded
Companies: Equinix Japan
Sources: エクイニクス(PR TIMES)エクイニクス
Equinix OS4x Data Center
Minoh, Osaka · Operational · E3
14.4 MW(IT load)
Status as of: 2024-06-05
Content verified: not recorded
Companies: Equinix Japan
Sources: エクイニクスData Center Café